MUTHIA, Jihan Dara; OKTAVIANI, Cut Zukhrina; BULBA, Alfa Taras.
Persepsi Kontraktor Terhadap Faktor Penyebab Keterlambatan Pembayaran Termin Di Kota Banda Aceh.
JUTEKS : Jurnal Teknik Sipil, [S.l.], v. 8, n. 1, p. 50-56, apr. 2023.
ISSN 2621-9786.
Available at: <http://jurnal.pnk.ac.id/index.php/jutek/article/view/971>. Date accessed: 09 dec. 2024.
doi: https://doi.org/10.32511/juteks.v8i1.971.